Flooring Installation: What to Expect
Reviewed November 2026 · Carpets Plus Colortile WY, Thayne & Afton
Short answer: A flooring project runs in five stages: a free in-home measure, a written quote, ordering with a deposit, a wait for material if it is special order, and install day itself. The installation is usually the shortest part. Most of what makes a floor last, including flat subfloors, moisture testing and acclimation, is decided before the first plank or roll goes down. Our own crews follow the same steps for a Star Valley ranch house, a Teton Village condo or a new build in Jackson.
The process at a glance
| Stage | What happens | Typical timing |
|---|---|---|
| 1. Measure | Laser measure and floor plan at your home | One visit |
| 2. Quote | Itemized price for material, labor and prep | Shortly after the measure |
| 3. Order | 50% non-refundable deposit; in-stock material reserved or special order placed | When you are ready |
| 4. Lead time | Special-order material ships to us | Typically about 10 business days |
| 5. Scheduling | Install date set once material is in hand | Depends on crew calendar and season |
| 6. Install | Tear-out, prep, installation, cleanup | Usually one to five days, by product and size |
| 7. Aftercare | Walkthrough, care instructions | Install day and after |
Step 1: The free measure
Someone from our team comes to the house and measures every room with a laser, building a scaled floor plan in MeasureSquare as they go. That plan is what the quote is built on. Our how we measure page shows what the drawing looks like.
The measure is free, and there are no travel or mileage charges anywhere in our service area, whether you are in Smoot, Alpine, Wilson or Driggs.
While we are there we also look at things a tape cannot tell you:
- what the subfloor is (concrete, plywood, OSB, or a floor over old flooring),
- how flat it is,
- transitions to other rooms and floor-height changes,
- stairs, closets and built-ins,
- door clearances and appliances,
- signs of moisture,
- whether there is in-floor radiant heat.
If you want a number before the visit, the online estimator gives a ballpark.
Step 2: The quote
You get a written quote based on the floor plan. A complete flooring quote should spell out:
- the product, color and quantity,
- pad or underlayment,
- installation labor,
- removal and disposal of old flooring, if we are doing it,
- furniture moving, if we are doing it,
- subfloor preparation that can be seen in advance,
- transitions, stair work, and baseboard or quarter-round,
- sales tax.
Our quotes are based on the material ordered, which includes the cutting and seam allowance shown on the floor plan, and carpet quotes include standard pad.
One caveat applies to any flooring quote: some subfloor conditions cannot be seen until the old floor comes up. Tear-out is a base price, and leveling after removal is extra. If we find heavy glue, water damage or a slab that needs leveling, we talk with you before doing the work.
For what drives the number, see what affects flooring cost in Wyoming. We do not charge travel or mileage anywhere we serve, including Teton County, Teton Valley, Idaho, Star Valley, Montpelier and Bear Lake.
Step 3: Ordering and deposit
A 50% deposit is due when materials are ordered, and it is non-refundable. The balance is due on completion. We accept cash, check, ACH and credit or debit cards, with a 3% processing fee on credit cards. Special-order and cut material cannot be returned. If you need to reschedule or cancel an install date, tell us at least 48 hours ahead, or a late fee may apply.
What happens next depends on whether the material is in stock.
- In stock. We keep carpet, carpet tile and LVP on hand, with the LVP held at both Thayne and Afton. If your choice is on the floor, it can be reserved for your job right away. See in-stock flooring.
- Special order. Hardwood and laminate are always ordered per job, as are many designer carpets, wool styles and specific LVP colors.
Step 4: Lead times in rural Wyoming
Special-order material typically reaches us in about 10 business days, and then we schedule the installation, which usually takes one to five days depending on the size of the job. Some products can take longer. We give you an expected date when you order, and all dates are estimates.
Freight into rural Wyoming, backorders on a specific color, and winter road closures can all stretch that. We order the whole job at once so dye lots match, which means waiting for the full quantity.
If you are working toward a move-in date, a closing or a rental season, tell us at the measure so we can point you at products that fit the schedule. For new builds, see new construction flooring.
Step 5: Getting the house ready
Furniture. Clear small items, electronics, breakables, closet floors and anything on shelves that could be bumped. Strip the beds and empty bookcases, china cabinets and refrigerators. Our crews move ordinary furniture as a quoted line, at the owner's risk. They do not move fish tanks, waterbeds, gun safes, pool tables, grandfather clocks, pianos, organs or anything fixed in place, and they do not disconnect electronics, hardwired appliances, gas stoves, gas dryers or ice makers.
Old flooring. Removal and disposal are part of the job only when they are written on the sales order, so check that line. Carpet comes out quickly. Hardwood, tile and glued-down floors take longer and cost more to remove.
Doors, trim and paint. A thicker new floor may mean doors need trimming, and baseboards may need to be reset or quarter-round added. Do not assume door or baseboard work is included; ask at the measure, and make sure anything agreed is written on the order. Painting is best done before installation, with touch-up after.
Heat, power and access. For carpet, the house has to be at least 65°F for three hours before, during and after installation. For hardwood, it has to be held at 60–80°F and 30–50% relative humidity from 48 hours before delivery onward. The power has to be on, crews need a clear path from the driveway, and an adult 18 or older has to be there to let them in.
Step 6: Subfloor prep, moisture testing and acclimation
Flatness
Hard-surface floors follow the subfloor. The industry tolerance for wood, LVP and laminate is flat to within 3/16 inch over 10 feet, or 1/8 inch over 6 feet. Hallmark Floors, COREtec and Mohawk all publish that figure. Outside it, click joints flex and can fail.
Fixing it means grinding high spots, filling low ones with patching or leveling compound, and screwing down loose or squeaky panels. Carpet and pad are more forgiving but will not hide a real hump or dip.
Moisture testing
Moisture is the leading cause of flooring failures, and concrete is the usual source. A slab can look and feel dry while still releasing vapor.
Two standard tests are used on concrete:
| Test | How it works | Common limits |
|---|---|---|
| Calcium chloride (ASTM F1869) | A dish of calcium chloride is sealed to the slab for 60–72 hours and weighed to measure vapor coming off the surface | 3 lbs per 1,000 sq ft per 24 hours for most glue-down floors and wood; some floating LVP allows up to 8 lbs |
| In-slab relative humidity probe (ASTM F2170) | Sensors are set in holes drilled into the slab to read humidity inside the concrete | 75% RH for most adhesives and wood; some floating LVP allows up to 90% |
The product's own instructions set the limit. A floating rigid-core LVP tolerates much more slab moisture than a glued engineered hardwood, which is one reason LVP is the standard choice for basements; see waterproof LVP for basements.
Wood subfloors are checked with a moisture meter. For hardwood, the subfloor should generally be at or under 12% moisture content and within a few percentage points of the flooring itself.
New concrete needs time. Manufacturer guidance commonly calls for at least 60 days of drying before testing, and gypsum pours over radiant tubing need to be dried with the heating system running. See flooring over radiant heat.
On hardwood jobs we moisture-test both the wood and the subfloor. On concrete, we check moisture before installing and follow the flooring manufacturer's test requirements.
Acclimation
Acclimation means letting the material and the house come to the same conditions before installation. It is about conditions, not a fixed number of days.
| Flooring | What it needs before installation |
|---|---|
| Hardwood | House held at 60–80°F and 30–50% relative humidity for at least 48 hours before delivery and through installation, checked with a hygrometer; moisture readings of flooring and subfloor compared. Engineered floors often need only a day or two on site in closed boxes; follow the product's instructions. |
| LVP | Varies by product. Some rigid-core floors need no acclimation; others ask for 48 hours. Room at about 55–85°F either way. |
| Laminate | Usually 48 hours or so in the room, per the manufacturer. |
| Carpet | Home at 65°F or warmer for at least three hours before, during and after; carpet unrolled to relax before stretching. |
In our climate, the hardwood row matters most. A wood floor acclimated to a house in a damp week of May will shrink in a dry January. The goal is to install at the conditions the house will actually be kept at, and then keep it there. See hardwood in a dry climate.
Step 7: Install day
Who shows up. Our own install crews, working for us, with your floor plan in hand. Expect noise, some dust during tear-out and prep, and doors opening and closing.
How long it takes
| Project | Typical duration |
|---|---|
| Carpet, a few bedrooms | Often one day |
| Carpet, whole house | One to two days |
| Carpet on stairs | Adds a few hours |
| LVP, a kitchen or single room | Often one day |
| LVP, a main floor | One to three days |
| Engineered hardwood, main floor | Several days |
| Solid hardwood, prefinished | Several days; longer on large jobs |
These are rough guides; most installations take one to five days. Tear-out, leveling and stairs add time. All the hardwood we install is prefinished at the factory, so there is no on-site sanding or finish cure to wait on.
How it is done right. Carpet is power-stretched, not just kicked in, which is what keeps it from rippling later, and carpet manufacturers require it. Floating floors get an expansion gap at every wall, hidden by trim. Carpet seams are built to be durable, but no seam is invisible.
At the end. The crew walks the job with you. Cleanup and trash haul-off are part of the job when they are on the sales order. Look at seams, transitions, stair edges and door swings, and ask anything you like.
Aftercare
Carpet - Vacuum freely. Loose fibers shedding for the first few weeks is normal for cut-pile carpet. - If a ripple appears later, call us; it can usually be restretched. Installation labor, including stretching and seams, carries a 12-month warranty.
LVP and laminate - Floating floors can be walked on right away. Glue-down floors need the adhesive's cure time before heavy furniture. - Put felt pads under furniture and use a hard-surface chair mat under rolling chairs. - Sweep grit often and damp mop.
Hardwood - Hold the house at 30–50% humidity and 60–80°F for the life of the floor, and watch it with a hygrometer. A humidifier is close to mandatory here in winter. - Felt pads, mats at doors, and no wet mopping.
Every floor - Use walk-off mats at exterior doors and clean up deicer residue promptly in winter. Our mudroom flooring page has more. - Keep the manufacturer's care and warranty information we provide. Manufacturer warranties depend on following those care instructions.
What we see in Jackson Hole & Star Valley
Winter installs work, with heat. The house has to be warm and the material cannot sit in a frozen garage or an unheated cabin beforehand.
Basement slabs deserve a test, not trust. Snowmelt and spring groundwater mean a slab that is dry in October may not be in April.
Wood needs the humidifier running before it arrives. In a new build, that means the mechanical system is commissioned before hardwood is delivered, not after. That matters on new Jackson and Wilson builds with radiant heat.
Second homes need someone on site. For a Teton County second home or a Teton Village rental condo, line up a caretaker: an adult has to let the crew in, with power on and heat up.
Our take
- On a deadline: choose in-stock carpet or LVP and book as early as you can.
- Setting your heart on a special-order floor: order first, then schedule painters and movers around the delivery.
- Installing over concrete: ask for a moisture test, and treat the result as a requirement.
- Installing hardwood: get humidity control working before the wood is delivered.
- Still deciding what to install: start with how to choose flooring for a Wyoming home, carpet vs. LVP, or flooring for cabins and mountain homes.
FAQ
How long does it take to install new flooring?
Installation itself is usually quick. Carpet in a few rooms is often a one-day job, LVP on a main floor typically takes one to three days, and prefinished hardwood usually takes several days. Tear-out, subfloor repair and stairs add time. The longer part of most projects is waiting for special-order material to arrive.
Do I need to move my furniture before installation?
Clear small items, breakables and electronics, strip beds and empty bookcases. Our crews move ordinary furniture as a quoted line on your order, at the owner's risk. They do not move pianos, pool tables, gun safes, fish tanks or waterbeds, and they do not disconnect gas or hardwired appliances.
How long does flooring need to acclimate?
It depends on the product, and conditions matter more than days. Some rigid-core LVP needs no acclimation; other vinyl and laminate products ask for about 48 hours. Engineered hardwood often needs a day or two on site, and solid hardwood is installed once its moisture content is close to the subfloor's. The home must be at normal living temperature and humidity.
Why does concrete need a moisture test?
Concrete releases water vapor for a long time, and a slab can be damp inside while looking dry. Too much moisture breaks down adhesives and causes wood to cup. The standard tests are calcium chloride and in-slab humidity probes, compared with the flooring manufacturer's limit, commonly 3 pounds or 75% relative humidity for glued floors. We check moisture before installing and follow the manufacturer's test requirements.
How flat does a subfloor need to be?
For hardwood, LVP and laminate, the common requirement is flat to within 3/16 inch over 10 feet, or 1/8 inch over 6 feet. Dips and humps beyond that put stress on plank joints and can cause movement, noise or failure. Installers correct it by grinding high spots and filling low ones before the floor goes down.
How much is the deposit for new flooring?
A 50% deposit is due when materials are ordered, and it is non-refundable. The balance is due on completion. We take cash, check, ACH and cards, with a 3% fee on credit cards. Your written quote shows the full price before you commit.
Do you install flooring in Jackson Hole, Wilson and Teton Village?
Yes. Our own crews install throughout Teton County and in Teton Valley, Idaho, with no travel or mileage fee. Commercial work there has included Teton County School District, Jackson Hole Airport and St. John's Health.
Next step
Every project starts with the measure. It is free, it comes with a floor plan, and there are no travel or mileage charges.
Looking for crews in your town? See flooring installers near me.
Already have one of our floors, or one on order? Questions about your floor are welcome: call or text Thayne (307) 284-2457 or Afton (307) 248-9777.
Questions about your floor?
Call or text Thayne (307) 284-2457 or Afton (307) 248-9777, Mon–Fri 9:30–5. Planning a project? We measure for free across Jackson Hole, Star Valley and Teton Valley, with no travel fees.